Danlaid Contracting have completed the bridge restoration project for Melbourne Water. The project consisted of five bridges, where the concrete had to be protected and repaired.
Danlaid Contracting were contracted to prepare the concrete columns for the Parchem LJ collars, clean the concrete structure, repair damaged concrete and apply Emerstop crème, an iso-octyltiethoxy silane water repellant and chloride protection system.
The advantages of performing these works included reduced cost, little disruption to the use of the bridge, and reduced environmental impact on the surrounding area and water way.