Express Power installed a commercial solar power system for the Parsons Management Group in July 2012 at their new premises under construction at 88 Marine Tce, Fremantle.
Completed within a single day, the installation included cabling logistics involving several challenges such as a lift shaft through the centre of the structure. The solar power system was installed on a 3-storey mixed residential/ commercially zoned dwelling in the heart of the harbour strip.
The new building complements Parsons’ existing business, The Fremantle Boat Park located directly across at the Fremantle fishing boat harbour.