ASP Access Floors embraced structural form, material consumption, construction efficiency, lifecycle costs as well as environmental and economic outcomes to achieve outstanding results for their client Aurecon.
For the C7 Aurecon building in Docklands, Victoria, ASP met Aurecon’s world class efficiency and sustainability goals by utilising their underfloor air conditioning system through a medium grade access floor system to cover 16,000 square metres. The project was completed in October 2012.
ASP’s steel cementitious ultra fix system with a 3.7Kn loading at 450mm FFH ensured the project achieved outstanding results. Additionally, an airtight system was used, which met the air leakage requirements of the project.