ASP Access Floors worked with Cockram Constructions to provide an efficient, environment-friendly raised access floor system within a modern learning environment at the Box Hill Institute, Victoria.
Completed in September 2013, the 2,500m² access floor installation used ASP’s steel cementitious ultra fix system with a 3.0Kn loading at 115mm FFH, and steel cementitious HPL rigid grid system with a 4.5kN loading at 550mm FFH.