In October 2005 FRH Group were awarded the contract for the third stage of the Maroochydore Road Upgrade works (Enterprise St to Martins Creek West).
Incorporated in the project design was a large concrete crib retaining wall. Concrib had been involved with the construction of similar structures incorporated in the first and second stages of this important Sunshine Coast roads improvement programme.
FRH Group have appointed Concrib to construct the wall for the third stage of the Maroochydore Road Upgrade works.
The crib wall on this project was a substantial structure up to 4.5m high with a 20kPa surcharge loading above the wall in some areas. A total of about 350 square metres of walling was built.
As well as completing the work on time and within budget, Concrib were able to refine the structural design of the wall, thereby enabling a cost saving to be passed to the client.
The completed wall was finished with landscape planting and mulch over the top to create a pleasant presentation.