Two tapware products from Galvin Engineering were specified for the fitout in the Emergency Department of the Townsville Hospital in Queensland during the redevelopment project.
Designed by Cox Rainer architects with McKendry Rein and Peterson as the hydraulic consultants, the Townsville Hospital redevelopment was funded by the Government following the 2009 State elections.
A sum of $25 million was committed to fit out Level 2 of the Emergency Department as well as refurbish associated areas within the existing Acute Care building specifically for an expanded NICU facility, taking the total across Level 2 and Level 3 to 50 cots.
Galvin Engineering supplied Flowmatic electronic tapware and CliniLever tapware for the fitout.