Retractable bollards from Leda Security Products were installed at the National Jewish Centre in Canberra for construction company Manteena.
The installation of retractable bollards needs to be done carefully; Leda’s experienced team of staff and contractors carried out this installation with precision and without error.
The project required three semi automatic retractable bollards from Leda. To install them, a deep strip footing was first excavated before steel reinforcing cages were laid and the bollards suspended from special levelling devices.
It is extremely important to ensure the bollards are plumbed exactly as there is no room for adjustment once the concrete footings are poured.