Several transport infrastructure products from Stoddart Australia were specified for the Rosanna Station upgrade in 2018. Working with Ace Contractors, Stoddart supplied station bins and station seats for the platforms, concourse and Turnham Ave bus interchange. Two Evo shelters were also installed during the upgrade.
While one is a standard Stoddart Infrastructure Evo MKII shelter, the other is a heavily modified Evo Premium shelter featuring high quality architectural finishes that help tie the concourse to the Turnham Ave interchange.
Featuring black powdercoated aluminium framing and cladding, with a perforated plywood soffit, the shelter was supplied complete with custom LED strip lighting and plinth integrated seating. The high quality fabrication and finishes are evident throughout the shelter as well as on the polished stainless steel Station Suite.
Thanks to the perfect balance of aesthetics and durability, Stoddart products are widely specified across the Level Crossing Removal Authority projects as well as public transport projects Australia-wide.