Case study: Wonthaggi Hospital, VIC
The Stage One expansion and upgrade of Wonthaggi Hospital was opened in February 2023 and delivered 32 new inpatient beds and a new emergency department with 18 additional treatment spaces for the residents of Bass Coast Shire in Regional Victoria. Construction commenced during the peak of the COVID-19 health crisis.
The Stage One expansion and upgrade of Wonthaggi Hospital was opened in February 2023 and delivered 32 new inpatient beds and a new emergency department with 18 additional treatment spaces for the residents of Bass Coast Shire in Regional Victoria. Construction commenced during the peak of the COVID-19 health crisis.
Download the case study to learn how ASSA ABLOY Entrance Systems collaborated on the design of all automatic sliding and swing doors entrances throughout the hospital, with a primary focus on touchless door controls and infection control measures.
Case study: Wonthaggi Hospital, VIC
The Stage One expansion and upgrade of Wonthaggi Hospital was opened in February 2023 and delivered 32 new inpatient beds and a new emergency department with 18 additional treatment spaces for the residents of Bass Coast Shire in Regional Victoria. Construction commenced during the peak of the COVID-19 health crisis.- Popular Articles