Insulated panels from Metecno effectively addressed the limited access problems at the Yorkshire Brewery project site in Melbourne without increasing costs.
With limited access for cranes and scaffolding, the project site didn’t allow for the installation of standard curtain walls and insulated panel systems.
MetecnoKasset was the perfect choice for the Yorkshire Brewery project because the panels could be installed from inside the building, allowing the developers to use insulated panel products without the added costs and logistics issues.