SBS Group was commissioned to fabricate and supply the internal ceiling framework for the Myer Melbourne redevelopment project in Melbourne, Victoria.
Designed by NH Architecture and the Buchan Group, and built by Probuild Construction, the project required bulkhead framing to be supplied for all seven levels.
SBS designed and shop-detailed the internal ceiling framework for all seven levels; the seventh level was the most challenging as it involved a three-dimensional raked coffered ceiling.
SBS engineered and prefabricated the entire framework using SBS Smart Frame, helping the builder achieve the tight schedule on a very difficult site application.