Improving access to high quality and contemporary healthcare services for the community
In 2019, the NSW State Government committed $68.7 million towards the Stage 1 redevelopment of the Bowral & District Hospital in South Western Sydney. Access to high quality and contemporary healthcare is a critical part of every community, and Studco Building Systems jumped at the chance to be involved in a project bringing these necessary services to the local community.
Studco continues to build upon their extensive history of being involved in major hospital projects through economical engineering solutions and quality products designed to withstand the demands of these facilities. Studco’s experience in health sector projects and ability to provide high quality engineering designs whilst meeting short lead times were key factors in being selected. The team’s dedication to facilitating the demands of this project ensured it continued to run on schedule, as any delays would impact the local community.
Studco supplied engineered designs and support throughout the process. The technical team’s skills met the requirements of the project, and their commitment to high-quality service enabled a productive experience. They were able to provide quick turnarounds for initial engineering designs, thorough site inspections and continuous support throughout the entire construction.
An innovative solution creating strong openings in internal and external walls
The HEDA Tough Wall System was key in developing wall openings that could withstand the high demands of healthcare facilities. This system provided structural strength to larger openings such as windows in external walls and examining rooms, or larger doorways throughout the redevelopment. HEDA jambs and connectors were used in place of the traditional method of installing multiple studs alongside wall openings. Similarly, these two pieces, which make up the HEDA Tough Wall System, were used as an innovative replacement for traditional stud and track acting as a lintel in wall openings.
The HEDA Tough Wall System provides a fast and easy way of creating openings in walls in both internal and external applications. This system uses fewer sections and fewer connections than traditional methods of creating wall openings, cutting construction time and simplifying the construction process.
Carrying a heavy load in gusty conditions
Studco steel studs and slotted deflection head tracks were used to create the external walls of this project. Studco’s Rapid Track slotted deflection track is designed for internal and external walls, which are subject to heavy weight loading and dynamic wind loads. This made them a great solution for the external walls in this redevelopment and Studco’s technical team provided the engineering to ensure the systems would satisfy the various forces these walls would be subject to, going forward.
The canvas for an architectural vision
Studco provided top hat sections to ensure the architectural design vision of the external walls could be met. Studco top hat sections provided a fixing point for external façade cladding and attached directly to the external wall structure. These versatile top hats are suitable for a range of lining materials, which made them an ideal solution for the installation of the external façade of the new Bowral & District Hospital.
Products used
- Studco Stud and Track
- RapidTrack Slotted Deflection Track
- HEDA Jamb
- Studco Top Hats